ACP-5 asbestos investigation for NYC permits.

Before the Department of Buildings will issue most renovation, alteration or demolition permits, the project needs an asbestos determination from a NYC DEP Certified Asbestos Investigator. We survey, sample and file the ACP-5 under our own license, coordinated with your architect and expediter so environmental never becomes the item holding up an application.

NYC DEP Certified Asbestos Investigator NYS DOL Licensed Asbestos Personnel AIHA-Accredited Laboratories Filed under our own license
Investigator taking a bulk sample of pipe insulation
The engagement

Survey, sampling and filing, under one license.

The firms we work with bring us in at schematic design, so the asbestos determination is settled before the permit set is. Findings are written so your team can design around them.

  • Certified Asbestos Investigator survey and inspection report
  • Bulk sampling with analysis at AIHA-accredited laboratories
  • ACP-5 Asbestos Assessment Report prepared and filed with DEP
  • ACP-7 support and project design when abatement is required
  • Variance support for phased or complex projects
  • Direct coordination with your expediter or filing representative
The determination

Three outcomes, each with a clear path.

When the survey finds no asbestos-containing material, material that will not be disturbed, or a minor project, the investigator files an ACP-5 with DEP and it supports the DOB permit application.

When the work will disturb more than 25 linear feet or more than 10 square feet of asbestos-containing material, it becomes an asbestos project. An ACP-7 notification is filed at least one week before work starts, and abatement proceeds with independent air monitoring, which we also provide.

Either way, you know the answer early, in writing, and in a form your architect and expediter can act on.

Environmental should never be the item holding up a permit.
Raza Environmental
How we engage

A relationship first. Then the work.

01

Conversation

Drawings or a scope note, the address and your target filing date. We confirm what the permit requires, usually the same day, at a fixed fee.

02

Survey & sampling

A certified investigator surveys the affected area, sequenced around your schedule, with off-hours access arranged on our end.

03

Laboratory

Bulk samples analyzed at AIHA-accredited laboratories, with expedited turnaround when a filing date is close.

04

Filing & coordination

The ACP-5 prepared, signed and filed under our license, with confirmation sent to you and your expediter.

Engaged by

The teams who carry the permit.

Architects

Pre-design surveys scoped to your drawings, with findings delivered in time to shape the design rather than delay it.

Expediters

A firm that answers the same day and files under its own license, so the asbestos determination lines up with the DOB application.

Contractors & owners

Gut renovations, alterations and demolitions that need a clear determination before work begins.

Questions

ACP-5, answered.

What is an ACP-5?

The ACP-5 is the NYC DEP Asbestos Assessment Report. After surveying the work area, a DEP Certified Asbestos Investigator signs and seals it to state that the area is free of asbestos-containing material, that the material present will not be disturbed, or that the amount to be removed is a minor project.

When does a project need an ACP-5?

Building owners must have a DEP Certified Asbestos Investigator survey the affected area before most renovation, alteration and demolition work. When the result is no ACM, ACM that will not be disturbed, or a minor project, the investigator files an ACP-5 with DEP and it supports the DOB permit application.

What happens if asbestos will be disturbed?

If the work will disturb more than 25 linear feet or more than 10 square feet of asbestos-containing material, it becomes an asbestos project. The owner or authorized agent files an ACP-7 Asbestos Project Notification with DEP at least one week before work starts, and abatement and independent air monitoring follow.

Is an ACP-5 needed for a full-building demolition?

Yes. DOB issues a full demolition permit based on an ACP-5 that confirms the entire building is free of asbestos-containing material. ACP-20 and ACP-21 completion forms are not accepted for that purpose.

Do you work with my expediter?

Yes. We coordinate directly with your expediter or filing representative so the asbestos determination lines up with the DOB application.

Form requirements summarized from the NYC DEP asbestos abatement forms page.

When abatement follows

If the survey finds material that will be disturbed, we provide independent air and project monitoring from containment set-up through final clearance. Asbestos air and project monitoring.

Bring us in at the drawing stage.

Send the address and the scope of work. We will confirm what the permit requires, fix a fee and hold a date, usually the same day.